Kitchen Renos Part 2

We didn't get much done on the kitchen during the week. Pete had 3 night shifts then a day shift sooo that was him out for the week. I had several trips to the next town, normal work + unwell kids (last week of the school term is always a struggle to keep the kids well & able to go to school).

[[posterous-content:pid___0]]Since we haven't managed to get a plumber in to move the drains for the sink & sort out gas lines, I didn't think we'd be doing much this weekend. But we did. First Pete & our nephew pulled the wall cupboards & old exhaust fan out. Then the cupboards on the left.

[[posterous-content:pid___1]]And then the tiles. I got to swing a hammer for a while (and felt it this morning!). We basically had to chisel them off the wall, they were certainly stuck on well. I did about half, our nephew did the other side. Did ok except for the last bit - there's now a bit of a hole in the wall near the sink. Pete brought back in one of the old benches so that we'd be able to have some space!!

 

Comments

Popular posts from this blog

Camping

1st December

School Holiday Stitching